Paving in cold weather can present significant challenges. If paving equipment operators aren’t experienced working with asphalt in sub-optimal weather, they will find it difficult to maintain the appropriate mix temperature to achieve successful compaction of 92-95%.

 

With a few adjustments and the right training, asphalt contractors can complete paving projects in cold weather without compromising the performance of the pavement. Use the tips below to expand your paving business into colder months and gain a competitive advantage over your competitors.

 

The critical factors to alter for successful paving in cold weather include:

 

  • Mix Temperature
  • Thickness
  • Length of Haul
  • Hopper Management

 

MIX TEMPERATURE

 

The most important adjustment asphalt contractors must make when paving in cold weather is heating the mix to a higher temperature. Air temperature, wind chill, and the amount of direct sunlight impact how quickly the mix will cool to 175°F and become solid. The production temperature of the mix should be a minimum of 290°F, but no more than 330°F which could damage the asphalt mix. Use an electric-heated paving screed for more temperature control. Adjust your screed heat to about 280°F and your extensions to about 300°F to keep the mix workable in cold weather.

 

THICKNESS

 

Depending on the temperature, contractors should adjust the mat thickness. In summer, a 1-inch mat is attainable because the ground is warmer and the mix maintains heat, but in cold temperatures, a 1-inch mat will cool too quickly for proper compaction when its poured onto the cold ground. To achieve adequate density, conditions should allow for approximately 10 minutes of rolling. Use the guideline below to determine the appropriate lift thickness for the temperature conditions.

 

Lift Thickness      Minimum Temperature

 

1” or less                55°F

 

1.1” to 2”                45°F

 

2.1” to 3”                40°F

 

3.1” to 4 “               35°F

 

4.1” to 8”                32°F

 

For temperatures lower than 32°F, major asphalt paving projects are not advised. However, pothole repair or other asphalt patches can be completed in sub-freezing temperatures using cold asphalt mix. Cold asphalt patches should be considered temporary fixes until the repair can be done using hot asphalt mix when weather conditions improve.

 

LENGTH OF HAUL

 

The real key to paving in cold weather is timing. The timeline to get asphalt compacted is shorter in winter because the air temperature and ground temperature cool the mix faster. Eliminate waiting time as much as possible. You never want a paver waiting for a truck longer than 15 minutes; reduce the amount of time pavers are waiting for mix by using extra trucks. It’s also important to shrink distances between the asphalt rollers and the pavers. Some contractors choose to eliminate the middle roller when working in cold temperatures. A finish roller can be positioned as close as 200 feet behind the breakdown roller.

 

Heat sensors help monitor mat temperature to ensure rollers are not working on asphalt that has hit 175°F. At that point, the mix will stop rolling and start breaking.

 

HOPPER MANAGEMENT

 

When working in cold weather, make sure to never let the hopper run out. Manage the mix in the conveyor and tunnel, so that the hopper is always full. By keeping the hopper full, the mix will stay hot and keep the hopper hot. If it runs out, the paver won’t run as smoothly when it is refilled. Be sure to remove any chunks that have gone cold and hardened. These pieces can be broken up and added back to the mix to reduce waste.

 

ADDITIONAL TIPS FOR PAVING IN COLD WEATHER

 

  1. Secure a tarp over your truckloads to reduce heat loss if you are transporting long distances.
  2. End dump directly into the paver to avoid heat loss.
  3. Eliminate raking and other handwork where possible.
  4. Roll longitudinal joints as quickly as possible to avoid shrinkage cracks.
  5. Keep the screed hot – should be within 75 degrees of the mix temperature.
  6. Do not attempt a paving project if it is actively raining or the ground is still wet. The oils in the asphalt mix will repel any water it meets and the mix will be compromised.

 

By making these adjustments for paving in cold weather, you can get back to business sooner. For more information about paving in cold weather or for quality paving equipment rentals from industry-leading manufacturers, contact the equipment experts at Papé Machinery Construction & Forestry.

Related Content

How to Clear Diagnostic Codes on a John Deere Skid Steer

How to Clear Diagnostic Codes on a John Deere Skid Steer

John Deere skid steers are known for their reliability, durability, and advanced onboard technology. However, even the most dependable machines occasionally display fault codes or diagnostic codes when something needs attention. Knowing how to reset John Deere skid steer fault codes and troubleshoot potential issues can save valuable time and keep your projects on schedule….

How to Winterize Your Backhoe

How to Winterize Your Backhoe

With cold weather fast approaching, it’s crucial to keep your construction equipment up to speed in the wake of snow, frost, and freezing temperatures. To help you keep up with this preventive maintenance, we’ve compiled a comprehensive heavy equipment winterization checklist. Read on for more.

How to Clear Codes on A John Deere Skid Steer

How to Clear Codes on A John Deere Skid Steer

If you’ve recently completed a skid steer repair, but the diagnostic codes are still showing on the monitor, it doesn’t necessarily mean that the fix didn’t work. John Deere skid steer codes are designed to stay on the engagement and monitor unit until they are manually cleared. Luckily, the steps to complete this task are

New Equipment

At Papé Machinery Construction & Forestry, we offer top-tier equipment from trusted brands like John Deere. Our selection of excavators, dozers, and forestry machinery delivers reliable performance for construction and land management.

Used Equipment

At Papé Machinery Construction & Forestry, we offer quality used equipment from trusted brands like John Deere. From excavators and loaders to a variety of attachments, our inventory delivers reliable, cost-effective solutions for your job site needs.

Staying Connected

Stay up to date on the latest promotions and events at Papé!